We've started this year's garage...it measures 24' x 30'.

GETTING STARTED

bert 001:

.

USING THE TRANSIT

renee survey 1:

.

USING THE TRANSIT

renee survey 2:

.

USING THE TRANSIT

renee survey 3:

.

LAYING CONCRETE BLOCK

renee block 1:

.

LAYING CONCRETE BLOCK

renee block 2:

.

LAYING CONCRETE BLOCK

renee block 3:

.

OUR CLASS

renee 003:

.

TRENCHING CONTINUES

renee 005:

.

FOOTINGS POURED

renee 006:

.

BLOCK WORK

renee 008:

.

THE FLOOR

renee 009:

.

SILL BOARDS AND SEALER

renee 010:

.

BEGINNING WALL LAYOUT

renee 011:

.

RAISING THE FIRST WALL

renee 012:

.

RAISING THE FIRST WALL

renee 014:

.

RAISING THE FIRST WALL

renee 017:

.

SHOWING THE SUPPORT HEADER ABOVE THE WINDOW

renee 018:

.

FASTENING THE WALLS TOGETHER

renee 019:

.

USING THE PNEUMATIC NAILER

renee 020:

.

HAND NAILING :-)

renee 021:

.

THREE WALLS ALMOST DONE

renee 022:

.

THREE WALLS DONE

renee 023:

.

NAILING ON WALL SHEATHING

renee 026:

.

PUTTING ON HOUSE WRAP

renee 024:

.

SETTING TRUSSES

renee 025:

.

TRUSSES UP

renee 31:

.

BUILDING GABLE END OVERHANGS

renee 029:

.

.

SHEATHING THE GABLE END

renee 028:

.

PUTTING THE OVERHANG ON

renee 031:

.

SHEATHING THE ROOF

renee 032:

.

ONE HALF OF ROOF DONE

renee 033:

.

COBRA RIDGE ON (RIDGE VENT)

renee 034:

.

OVERHEAD DOOR BEING INSTALLED

renee 035:

.

SOFFIT & FASCIA BEING INSTALLED

renee 036:

.

FASCIA & SIDING BEING INSTALLED

Renee 037:

.

INSIDE

renee 051:

.

Done

renee 049:

.

Done

renee 050:

 